April 11, 2024 Pre-Special Town Meeting
5-page Summary (pdf)
Click image below for the 5-page pdf
Other Town's DPW Projects Cost Less (video)
For example, the Town of Tewksbury is 13 times the size of Truro, but is looking at a DPW project that is 25% less cost than the $35 Million projected for Truro's DPW by Weston & Sampson. How did Tewksbury do it? Their Building Committee, Town Manager and staff worked with Weston & Sampson to adapt and reuse existing buildings on the existing site, just as the DPW Study Group has recommended for the DPW Campus at Town Hall Hill. To see how they save many millions in taxpayer costs,
Click image below to watch the video where the Tewksbury DPW project is presented.
2-page Summary (pdf)
Click image below for the 2-page pdf
Peer Review Report (pdf)
Click image below to download the independent peer-review from a leading Northeast construction management services firm
Former DPW Director Letter (3 min video)
Click image below to watch a 3 minute video where the Select Board Chair reads a letter from the former long-standing DPW Director against moving the DPW to Route 6.
Hear from the head of the DPW for many years, including the years in which the safety facility plans were developed and approved by the ZBA and the town vote in 1992. And how the Route 6 site was discussed and rejected for many. reasons that still apply. And why we should fully consider all options before we risk safety and health of any of our townsfolk and before we ask taxpayers to consider limited and really expensive options too soon.
8-page Basis of Design (pdf)
Click image below to download the 8-page pdf